1.6Continuity of ETOPS

1.6.1 Due to the special nature of ETOPS an operator is required to maintain processes and procedures once ETOPS approval is issued.

1.6.2 Where a carrier ceases ETOPS operations for a period exceeding 13months, application for re instatement must be submitted. Recommendation from the Regional Director, Airworthiness must be forwarded to the Chief, Airline Inspection or Regional Director, Air Carrier, as appropriate, for approval, prior to conducting such operations.

Date modified: