2.9Simulator Validation Checks

2.9.1 Inspectors and CCPs are to continually observe the maintenance standard and operation of simulators to ensure that they meet the performance standards required for certification. Where serious or long term deficiencies are noted, the sponsor is to be advised and the Simulator Condition Report, a sample of which is found on the next page (printed single-sided for photocopying purposes), is to be completed and forwarded to the MSP.

Date modified: