National Places of Refuge Contingency Plan
The purpose of the National Places of Refuge Contingency Plan (PORCP) is to establish a national framework and approach which, with associated regional measures, will provide for an effective and efficient response to requests from ships in need of assistance seeking a place of refuge.
The PORCP will help to ensure that a consistent approach is taken across the country to putting in place an effective response plan that will meet both Canada’s national and international responsibilities.
The PORCP provides a decision-making risk assessment tool for Transport Canada Marine Safety Regional Directors which will help to ensure that a thorough and balanced assessment of the risks are made and the best risk control strategy can be decided on and implemented in a timely and safe manner.
The PORCP takes into account International Maritime Organization (IMO) Resolution A.949(23) “Guidelines on Places of Refuge for Ships in Need of Assistance.”
There have been a number of places of refuge type incidents that have taken place in Canada such as: Kurdistan – 1979; Dodsland – 1987; Trave Ore – 1989; Glenville – 1990; Eastern Power – 2000; Kitano – 2001. In the absence of a formal approach, such incidents were handled in an ad hoc manner, although more recently the Regional Environmental Emergencies Team (REET), port authorities and the provinces have also been engaged in the process.
In recent years, there have been a few high profile international incidents that have resulted in either a ship pollution disaster, or a near miss of one, involving ships that were refused a place of refuge (e.g., Erika in 1999, Castor in 2000, and Prestige 2002). Consequently, the issue of the provision of a place of refuge to a ship in need of assistance has become a priority for governments worldwide.
On December 5, 2003, the International Maritime Organization (IMO) adopted Guidelines on Places of Refuge for Ships in Need of Assistance (resolution A.949(23)).
The purpose of the IMO Guidelines is “to provide Member Governments, shipmasters, companies and salvors with a framework enabling them to respond effectively and in such a way that, in any given situation, the efforts of the ship master and the shipping company concerned and the efforts of the government authorities involved are complementary. In particular, an attempt has been made to arrive at a common framework for assessing the situation of ships in need of assistance” (ss 1.12, A.949(23)).
The IMO Guidelines recommend that “coastal States endeavour to establish procedures consistent with these Guidelines by which to receive and act on requests for assistance with a view to authorizing, where appropriate, the use of a suitable place of refuge” (ss.3.4, A.949(23)).
Furthermore, the IMO Guidelines recognize that there are no international obligations for coastal States to provide a place of refuge; however, the Guidelines state that “the coastal State should weigh all the factors and risks in a balanced manner and give shelter whenever reasonably possible” (ss.3.12, A.949(23)).
Transport Canada is the lead agency for decisions related to a ship in need of assistance and requesting a place of refuge. As such, Transport Canada is responsible for ensuring the IMO Guidelines are taken into account and implemented to the extent possible.
The PORCP applies to all situations where a ship is in need of assistance and requests a place of refuge within Canadian waters. This includes Canada’s internal waters, territorial sea and the Exclusive Economic Zone (EEZ).
The PORCP also applies in the case where a ship is destined for Canada and has reported a problem (a defect, deficiency or a casualty).
The PORCP does not apply to distress situations where the safety of life is involved. In such cases, established search and rescue procedures shall be followed. Any request that includes a requirement to rescue or to immediately evacuate the crew or other persons on board should be re-directed by the Maritime Assistance Service (MAS) to the Maritime Rescue Coordination Center (MRCC) without delay. Once the rescue has been concluded and there is no longer any risk to the safety of life, the PORCP can be activated.
In cases where ship damage has resulted in the discharge of a pollutant or there is an imminent threat of a discharge of a pollutant, the PORCP would be implemented in conjunction with current response procedures and contingency plans. While decisions concerning a place of refuge fall under the responsibility of Transport Canada, the Canadian Coast Guard (CCG) through the authority of the Minister of Fisheries and Oceans Canada has the responsibility for responding to ship-source pollution spills and will fulfill the federal monitoring and on-scene command role for the Government of Canada.
In urgent situations, the PORCP will be followed to the extent possible given the time available for decision making.
In applying the PORCP, every effort should be made by all involved to cooperate, work closely together, allow for an open exchange of information and build consensus in the decision-making process. Where consensus cannot be reached, the best decision will be made by TC as the lead agency, in conjunction with other authorities with jurisdiction.
The PORCP is to be applied within the framework of existing laws (local, national and international law).
Hazard:
MAS:
Place of Refuge:
Risk:
Risk Scenario:
Ship in need of assistance:
Stakeholders:
Transport Canada:
The Canada Shipping Act (CSA) and the Canada Shipping Act, 2001 (CSA 2001) provide certain powers to direct a vessel, which would be needed to support the decisions and necessary actions related to a place of refuge incident.
The authority for directing a ship within Canadian waters and the EEZ can be found under paragraph 662(1)(f) of the CSA.This section authorizes Pollution Prevention Officers (PPOs) designated by the Minister of Transport to direct a ship where there are reasonable grounds to believe that such direction is justified to prevent the discharge of pollution due to, among other things, the condition of the ship or any of its equipment, or any deficiency in its complement or the nature and condition of its cargo. The PPO may direct the vessel to proceed to a particular place, to moor, anchor or remain at that place, to proceed or remain out of Canadian waters and the EEZ.
Section 189 of the CSA 2001 includes similar provisions to the above. This section authorizes the Minister of Transport to direct a vessel when there are reasonable grounds to believe that a vessel may discharge or may have discharged a prescribed pollutant. The authority to direct a vessel includes directing it to proceed through Canadian waters and the EEZ, or to a particular place, by a certain route and in a specified manner and to unload the pollutant or moor, anchor, or remain at a place. The Minister may authorize a marine safety inspector to exercise this authority pursuant to subsection 11(2) of the CSA 2001.
A marine safety inspector may also direct a vessel pursuant to subsection 211(3) of the CSA 2001. For the purpose of carrying out an inspection to ensure compliance with a relevant provision when necessary, a marine safety inspector may direct the master of a vessel to stop the vessel or proceed to a selected place and moor, anchor or remain there for a reasonable specified period.
With respect to marine security, the Minister may also direct a ship if it is believed to be a threat to security pursuant to section 16(1) of the Marine Transportation Security Act.
Fisheries and Oceans Canada:
While decisions concerning a place of refuge fall under the responsibility of Transport Canada, the CCG through the authority of the Minister of Fisheries and Oceans Canada has the responsibility for responding to ship-source pollution spills and will fulfill the federal monitoring or on-scene command role for the Government of Canada. In the case of a ship that has discharged or is likely to discharge a pollutant, the Minister of Fisheries and Oceans Canada has authority under section 678 of the CSA and under section 180 of the CSA 2001, to take such measures as necessary to repair, remedy, minimize or prevent pollution damage. In addition, in the CSA 2001, with respect to discharges or threats of discharges, Pollution Response Officers may direct a vessel pursuant to subsection 175.1(2).
Consequently, a place of refuge incident that also involves ship-source pollution or the imminent threat of pollution, decisions concerning a place of refuge will have to be in conjunction with Fisheries and Oceans Canada officials. The following excerpts from Annex D of the Memorandum of Understanding Between Transport Canada and Fisheries and Oceans Respecting Marine Transportation Safety and Environmental Protection, April 1996 clarifies the roles and responsibilities for decisions between the two departments that would be relevant in a place of refuge incident:
It should be noted that section 58 of the Canada Marine Act, provides port authorities with the power to direct a ship with respect to ships about to enter or within the port or an area of the port in particular circumstances.
Considering the authorities and jurisdictions of the CSA and CSA 2001 and those of the Canada Marine Act, there is a potential for conflicting directions being given to a ship concerning a specific port. In such situations, every effort must be made for the responsible authorities to agree on a required course of action.
The Regional Director TC Marine Safety, in collaboration with the Director of Maritime Services, CCG in the applicable region, is responsible for the decision to grant or deny access to a place of refuge, the selection of the place of refuge and any operational instructions and conditions given to the master or salvors related to the decision.
In cases where the Transport Canada Situation Centre is activated such as when the overall risk level is determined to be high (see Notification and Reporting section and for risk levels see Annex 5), decisions will be subject to approval through the Transport Canada Crisis Management Structure and the Crisis Management Team
Decisions involving other authorities with jurisdiction (i.e., port authority, local municipal authority) will be subject to approval by the relevant authority.
The Director, Operations and Environmental Programs, TC Marine Safety, Ottawa is responsible for the updating and maintenance of the PORCP.
Each Regional Director, TC Marine Safety is responsible for implementing the regional procedures and arrangements to take into account the PORCP.
The CCG provides the Maritime Assistance Service (MAS) function in Canada (as per Maritime Assistance Service (MAS), IMO resolution A.950 (23)). This service is intended to act as the point of contact between the ship in need of assistance and the coastal State. All communications with the ship shall go through the appropriate CCG Marine Communication and Traffic Services (MCTS) centre. If considered necessary to facilitate the exchange of information, temporary direct communications may be established between the ship and the risk assessment team, provided both parties agree and the MCTS centre is informed. However, all formal reporting notifications and any other communications required by national and international instruments shall continue to be made through the MCTS centre.
Notification within TC will follow established notification procedures as per Marine Safety’s General Notification Matrix for a Major Marine Incident. TC regional and national situation centres shall be activated in accordance with national (e.g.. Marine Safety Procedures for Activation of the Transport Canada Situation Centre (TCSC) in Ottawa) and regional procedures and should be considered in all cases when either: 1) the overall risk level is considered high; 2) extraordinary measures and resources are needed to mitigate the risk; or 3) when coordinated action of several authorities is required. Where it is impractical to use the regional situation centre, alternative arrangements may be made. Alternative arrangements should be identified in the regional procedures.
The Director, Operations and Environmental Programs, TC Marine Safety and the Regional Director, TC Marine Security shall be notified of all places of refuge incidents.
As soon as a decision is made, the TC Marine Safety region should notify and inform all stakeholders as soon as practicable.
Close collaboration with other countries will be needed when responding to incidents in waters adjacent to neighboring countries. Each TC Marine Safety region shall make arrangements for notifying and consulting applicable US, Danish and French authorities when dealing with incidents in boundary waters or where the outcomes could have an impact on the US, Greenland or St. Pierre and Miquelon. Transport Canada is aware of the responsibilities of the Canadian Coast Guard in circumstances when the Canada-United States Joint Marine Pollution Contingency Plan (JCP) is activated.
TC Marine Safety regional procedures and arrangements for places of refuge should be implemented in accordance with the PORCP. Procedures and arrangements should take into account and, where appropriate, build upon existing procedures and plans. Consideration should be given to identifying any specific needs, issues and concerns of stakeholders that would need to be taken into account in decisions related to a place of refuge.
Each TC Marine Safety region should bring the PORCP to the attention of the various port, local, regional authorities so that existing contingency plans and emergency procedures can be reviewed and updated as needed.
Contingency plans should take into account foreseeable accident scenarios that might result from the granting of a place of refuge and what measures might be taken to reduce the consequences. Foreseeable accident scenarios would include, pollution (oil, chemical, toxic), fire, explosion, radiation and biological accidents. Arrangements should be made to have the plans readily available to the risk assessment team (see Decision-Making Process) for consultation in an incident.
The most suitable place of refuge can only be determined after the details of the specific incident are known and thoroughly considered. To pre-designate places of refuge may be of limited value, as the limitations, operational considerations, hazards and associated risks will vary greatly with each incident. Experience in Canada has shown that because no two incidents, and the circumstance surrounding the incident, are very similar, the value of pre-planning lies primarily in ensuring information will be readily available (i.e., nautical charts and publications, port information, environmental and sensitivity data), along with the relevant specialists.
Therefore, to expedite the case specific analysis and decision-making process during an incident, each TC Marine Safety region should conduct a review of their coastal areas and assemble the information that would be needed to identify and compare suitable places of refuge and have this information readily available in the event of an incident. Annex 3 contains a list of criteria that could be helpful in identifying the most suitable places of refuge for a particular incident, taking into account the characteristics and facilities needed to address the problem.
In addition, information that will help to facilitate the process of evaluating the risks associated with a casualty at sea, along the coastline or in a place of refuge should also be compiled and measures taken to ensure this information is also readily available in the event of an incident. Annex 4 contains a list of areas (e.g., environmental, socio-economic and safety) that could be put at risk in the event of a casualty.
The above advance planning and assessments for places of refuge will require the involvement and expertise of DFO and EC, and other stakeholders as necessary
In general terms, the following risk assessment decision-making process has three main elements; 1) the ship request (owner,/charterer/mastor/salvor), 2) the risk assessment of the situation and options and 3) the action plan and monitoring its implementation.
An integral part of the decision-making process is continuous consideration to communicate and consult with stakeholders. It is also essential that the process is well documented throughout. The use of a risk assessment team in the process provides for a joint assessment of the situation involving the necessary authorities, experts and advisers in the evaluation of the situation and the weighing of the risks of the different options.
The decision-making process should be followed to the extent possible under the circumstances. However, it is recognized that each incident will have unique characteristics, dynamics, challenges and circumstances. The decision-making process is intended to be flexible to allow for a case-by-case assessment and to accommodate incidents of all levels of complexities and risk. Therefore, in completing each step in the process, and in the selection of the risk assessment team, those involved in the process should be guided by the importance of the decision to be made and the level of concern regarding the situation.
Recognizing that the situation at sea could deteriorate rapidly with time, a decision should be made as quickly as possible and the situation closely monitored until it is adequately resolved. However, a place of refuge incident will not transpire at such rate that a collaborative decision making process of some kind cannot be followed.
The decision-making process will determine if access is to be allowed or not. Where access is granted, the most suitable place must be identified and appropriate risk control measures implemented. Where the risk is considered too great and access to a place of refuge cannot be granted, then the nature and degree of assistance to the ship offshore must be decided upon, along with any operational recommendations. The risk assessment team and all involved stakeholders are to work towards the best operational decision possible fully aware that; (A) it is unlikely that one single option will be acceptable to everyone, and (B), not all the required information may be available or be completely reliable. Documentation of the process is critical.
The following process will facilitate effective and objective decision-making to determine the most suitable course of action:
Ship Request
1- Obtain the necessary ship information
2- Describe the problem and associated issues
3- Identify the risk assessment team and the stakeholders that may need to be consulted or kept informed
Communicate - Consult - Document
Risk Assessment
4 – Preliminary analysis of current situation
7) – Evaluate and compare the options
Communicate - Consult - Document
Action and Monitor:
8) – Decide:
or
9) - Review and agree on the ship’s proposed action plan and monitor the implementation until the situation has been resolved.
10) - Obtain feedback on the effectiveness of the process.
Communicate - Consult - Document
1- Obtain the necessary ship information
The TC Marine Safety regional office, through the CCG-MCTS, ensures the ship and/or the owner/charterer/salvor/cargo owner(s) has provided all the initial information needed to assess the initial request and that is required under the IMO Guidelines. Annex 1, Part 1 sets out the information that should be provided. For example, masters and salvors are to;
In addition to the information provided by the ship in the initial request for a place of refuge, other information will be needed to support the decision-making process. Ship contact information, ship particulars and current status information will be needed, including information on the condition and capabilities of the ship and details of its cargo. Annex 1, Part 2 contains a list of additional information that may be useful and should be obtained from the ship where relevant.
Regional Directors, TC Marine Safety should be prepared to validate any information using whatever means available using the resources of other federal departments, the provinces and territories. For example: Department of National Defense (DND) aircraft and ships, CCG helicopters and ships, Royal Canadian Mounted Police (RCMP) aircraft and small craft. With the involvement of the provinces and territories, it would be expected that we could to call upon their equipment and infrastructure.
Much of this information may have already been provided by the ship because of mandatory reporting requirements of a number of international and national instruments. The international requirements are listed in Annex 1 of the MAS Guidelines (A.950 (23)). Particularly relevant are the mandatory reporting requirements of the following;
2 - Describe the problem and associated issues
Based on the ship request and information provided, and taking into account Canada’s perspective as the coastal/port State, briefly summarize the problem or main concerns and other associated issues. This information becomes the key statement that will be used in the following steps and will help in identifying those people who can assist and who could be affected. Annex 1, Part 1, could be used to state the problem, issues and comments.
3 - Identify the risk assessment team and the stakeholders that may need to be consulted or kept informed
Risk Assessment Team
A regional risk assessment team should be established where possible to assess requests for places of refuge. Members are responsible for providing the technical expertise, guidance and research to the team so that the team can complete the necessary analysis and evaluations to advise the Regional Director, TC Marine Safety and to resolve the situation.
Members of the risk assessment team will be selected, as needed, depending on the particular incident. In all cases, the Regional Director, CCG shall be notified, who in turn will assign a CCG member to the risk assessment team as required. For potentially serious incidents, a Ship Rapid Assessment Team of marine surveyors will be established to correlate and evaluate shipboard data and plans to provide rapid technical guidance with respect to ship’s residual damaged stability and longitudinal strength. In environmental emergencies the multidiscipline Regional Environmental Emergency Team (REET) can provide environmental information and expertise and advise on the impacts of different courses of action. Additional members can be added as the analysis and decision-making process progresses. These may include experts and advisors from; other federal departments, provincial and territorial governments, other authorities with responsibility for areas likely to be affected and industry.
Each TC Marine Safety region shall make arrangements for a risk assessment team to be notified and assembled in the event of receiving a request for a place of refuge. The analysis, evaluations and decisions shall be documented.
Stakeholders
Stakeholders who could be affected by the decision and that may have to be consulted or kept informed should be identified.
List of Potential Risk Assessment Team Members and Stakeholders
Annex 2 contains a list of potential members to the risk assessment team or stakeholders that could affect or be affected by a place of refuge request. To facilitate identifying and contacting risk assessment team members and stakeholders, each TC Marine Safety region shall maintain a contact list of government experts and authorities, organizations, experts and stakeholders that may need to be contacted and participate in a place of refuge incident.
4 - Preliminary analysis of current situation
Based on the information provided, the Risk Assessment Team conducts a preliminary analysis of the ship’s current situation.
The preliminary analysis is a cursory look at the situation, scoping out the risk problem and getting an indication of the potential risks at sea. The preliminary analysis should briefly cover the following:
4.1 - Describe what can happen
Consideration is given to what could happen at sea given the current situation. Risk scenarios can be used to help identify the hazards and the potential risks. From this, the possible adverse consequences of what could happen, and the likelihood of it happening are estimated. The urgency and time frame for decision-making should also be estimated. Examples of hazards and risks are given in the Definitions section.
4.2 - Decide if any immediate action is necessary
Depending on the preliminary analysis, immediate action may be necessary to start addressing the risk even though all the critical information and analysis may not yet be available. This might involve taking emergency measures as per existing contingency plans, notifying shipping, providing immediate instructions to the ship to address urgent risks or taking action to complement efforts already underway by the ship.
4.3 - Decide if an inspection team should be deployed
An inspection team should board the ship, when appropriate and if time allows, to gather additional evaluation data for further assessment and decision-making. Deploying an inspection team will depend on safety and the situation. Based on the team’s evaluation, the information previously recorded on the ship and its current status (Annex 1, Part 1) is revised accordingly. The input and the analysis of the risks by the inspection team are integral to each of the remaining steps in the decision-making process. Team members may have to remain on board to provide advice, report on actions being taken by the ship or salvor, and to help monitor the condition of the ship.
Each TC Marine Safety region shall have arrangements in place for assembling an inspection team and placing them on the ship. A list of qualified personnel should be maintained that could be called upon to provide this expert shipboard inspection function bearing in mind the expertise required will depend on the situation.
5- Identify the Options
5.1 - Identify feasible places of refuge
Possible places of refuge are considered that could provide the ship with what it needs to address the problem and to minimize the threat of further damage. The most suitable ones are selected as options for further assessment. Depending on the circumstances, a suitable place of refuge could be a port, an anchorage or a sheltered location near the coast.
A place of refuge may be needed to;
The suitability of a place of refuge will also depend on a number of operational requirements specific to the situation such as, depth, distance, approaches, docking facilities and anchoring ground.
Annex 3 provides a list of criteria for identifying places of refuge suitable to the ship.
5.2 - Consider if anyone should be added to the risk assessment team or the stakeholder list
Once the feasible options have been identified, the composition of the risk assessment team and list of stakeholders should be reviewed.
6- Estimate the risk for each option
Annex 6 contains a table that could be used to record the risk assessment details from steps 6 and 7 for each option considered.
6.1 - Describe what can happen (risk scenarios, hazards, risks, consequences, probability)
As was done previously with the ship’s current situation, for each place of refuge option, risk scenarios are developed by describing what accidents could happen, or what could go wrong. The risk scenarios should identify the underlying hazards and associated risks that may generate or contribute to the potential consequences of bringing the ship into the place of refuge. The voyage from the ship’s current position to the place of refuge should be included in the scenarios. Examples of hazards and risks are given in the Definitions section.
Similarly, risk scenarios for the options associated with the ship remaining at sea are also to be prepared. Consideration should be given to the following options;
In some cases, more than one risk scenario may need to be identified for a particular option. This would be the case where very different accidents could happen or where a different sequence of events would lead to different risks. For example, one accident scenario may describe the worst foreseeable accident with a certain probability, while another accident scenario would describe an accident with less severe consequences but with a much higher likelihood of occurring. Depending on the severity and likelihood of the different scenarios for a particular option, the assessment team may select the ones for further risk estimation.
The potential consequences are then estimated for each option (i.e., each place of refuge and the 3 options at sea). The level of exposure to the hazard(s) will affect the potential consequence. For example, to understand the risk to the environment and the potential consequences from a pollutant (hazard), consideration needs to be given to; the type and quantity of the pollutant, the affect of weather, sea, current, and tide, and the waters and coastlines that will be exposed to the pollutant.
Annex 4 provides a list of some areas that could be put at risk and suffer adverse consequences in the event of a casualty. Three broad categories have been identified:
Consideration is given to the probability of the risk scenario happening and estimated. The probability will be a function of such things as; the condition of the ship, exposure to hazards such as weather and sea conditions, and distance and time to a suitable place of refuge.
6.2 - Estimate the risk level (risk matrix)
The overall risk associated with each option is estimated by considering the severity of the adverse consequences and the probability of the relevant risk scenario.
Annex 5 provides a method of categorizing the potential consequences and probability. A risk matrix can then be used to assign an overall level of risk for each option. Having an estimate of the level of risk will help in determining appropriate risk control measures and in comparing the risk associated with different options.
6.3 - Identify risk control measures and evaluate their impact on the risk level
Once the overall risk has been estimated for each scenario, control measures that could be implemented to reduce the risks to acceptable levels should be considered.
Examples of control measures are:
Control options may introduce new risks and costs that will also need to be factored in. Any other costs associated with implementing the options should be included with the consequences.
Control measures will serve to either help prevent the risk (reduce the probability), mitigate the risk (lessen the impact) or both. The control measures available and their effectiveness will also vary with the different options. The probability and the consequences should therefore be reassessed for each option to take into account the affect of the risk control measures and the overall level of risk re-evaluated.
Insurance and Financial Safeguards
The impact of the consequences and the costs may be offset by insurance or other financial safeguards (i.e., financial bond, bank guarantee, indemnity fund, P&I Club). The limits of liability or financial guarantee should be considered and factored in.
7 - Evaluate and compare the options
The overall risk levels of the various scenarios are then evaluated and compared and the advantages and disadvantages of each option carefully weighed. In weighing the advantages and disadvantages the following should be considered:
8 - Decide:
or
Based on the evaluation, a decision is required of the risk assessment team on whether to grant or deny access. Where access is granted, the place of refuge and control measures must be specified. Where access to a place of refuge is refused, then the reasons should be specified to the ship. The ship should also be told what assistance is available to the ship and what, if any, control measures are to be taken.
Access should be provided whenever reasonably possible, depending on the risk. Access should be granted where, with appropriate risk control measures, the estimated level of risk is considered low (i.e., risk level 1-3), or the risk is reduced as much as possible and the risk would clearly be lower than if the ship were to remain at sea.
In the case where the risk is considered too great and access to a place of refuge must be denied, then all possible assistance must be offered to the ship offshore so as to prevent and control any environmental damage that may or will occur.
9 - Review and agree on the ship’s proposed action plan and monitor the implementation until the situation has been resolved.
The ship shall prepare an action plan, taking into account the decision reached, together with any control measures that have been decided-on.
Once an action plan is agreed on, all authorities and other stakeholders should be notified as soon as possible.
The implementation and the situation should be monitored closely to address changes in the situation that would increase the risks and possibly requiring new decisions and additional control measures. Monitoring should continue until the situation has been resolved.
10 Obtain feedback on the effectiveness of the process.
Once the plan is completed, those involved in the incident should be asked to comment on the event. The feedback can then be recorded and used to make recommendations to the Marine Safety Executive for changes in these guidelines.
Information on the Ship and Its Current Status
Information on the Request
Information on the Ship Request (as per A.949(23))
What are the hazards and associated risk and estimated consequences of potential casualty if the ship:
Information on the Ship and Its Current Status
Additional Ship Information
List of Potential Risk Assessment Team Members and Stakeholders
| What is needed by the ship to address the problem? | Suitability of Options | |||
|---|---|---|---|---|
| Potential Requirements | Details | Refuge A | Refuge B | Refuge C |
| - Shelter (weather, sea, swell, ice) | ||||
| - Safe anchorage (holding ground, depth) | ||||
| - Facilities/Equipment - reception facilities, transfer facilities i.e., pumps, hoses, barges, lightering | ||||
| - Repair facilities – shipyard, cranes, cargo gear, personnel | ||||
| - Salvage and Towage | ||||
| - Emergency facilities - fire fighting | ||||
| - Docking requirements (draught, length, availability) | ||||
| - Sea room to manoeuvre | ||||
| - Other | ||||
| Other Place of Refuge Considerations | ||||
|
- Navigation (traffic, unobstructed approach, pilots, tides, currents, ice, anchorage) |
||||
| - Assistance nearby, if needed (Oil and chemical response, salvage, towage) | ||||
| - Distance to refuge versus urgency | ||||
| - Accessibility by land, sea, and air | ||||
| - Ability of refuge to contain or limit the spread of pollution | ||||
| - Characteristics of refuge that would reduce the impact of pollution or facilitate clean-up | ||||
| - Emergency Response Capabilities (i.e., SAR, evacuation, medical, HAZMAT) | ||||
| - Is there a site suitable for beaching the problem ship if necessary. | ||||
| - Security, ability to restrict area, access | ||||
| - Weather and Sea Conditions (prevailing wind, tide, current, ice, weather, sea) | ||||
Areas that could be put at risk in the event of a casualty
Health, Safety and Security
Environmental
Socio-Economic
Probability and Severity of Adverse Consequences and the Overall Risk Level
Estimate Severity of Adverse Consequences:
The severity of the overall consequences associated with a risk scenario can be categorized as follows:
Catastrophic: multiple deaths, multiple major injuries, extreme property or environmental damage, extreme negative impact on the economy, major national or long term impact.
Severe: death, major injuries, severe property or environmental damage, loss of the ship, major risk to safety or restriction to shipping, regional impact.
Significant: many injuries, significant property or environmental damage, short-term consequences, local impact
Minor: some minor injuries, some property or environmental damage, minor short-term consequences.
Estimate Probability of Adverse Consequence:
The overall probability associated with a risk scenario can be categorized as follows:
Highly probable: almost certain the accident will occur.
Probable: accident likely to occur.
Unlikely: accident could occur.
Improbable: accident not likely to occur.
Estimate the Overall Risk Level
The following risk matrix can be used to help determine and categorize the overall risk level for each option. This estimate can then be used to help compare one option with another.
| Severity of Adverse | Probability of Adverse Consequences Over Time | |||
|---|---|---|---|---|
| Consequence | Highly Probable | Probable | Unlikely | Improbable |
| Catastrophic | 9 | 8 | 7 | 5 |
| Severe | 8 | 7 | 6 | 3 |
| Significant | 7 | 6 | 4 | 2 |
| Minor | 5 | 3 | 2 | 1 |
Risk Level: Low (1-3) - Medium (4-6) - High (7-9)
Assessment Details
What is the problem and associated issues: (Step 2)
Option (i.e., port / place / at sea in position / continues voyage / taken out to sea): (Step 5)
Describe what could happen (risk scenarios, hazards, risks): (Step 6)
Potential Consequences: (Step 6, Annex 4):
Control Measures: (Step 6)