Appendix 1 (C) - TP 743 E

Previous Page  | Table of ContentsNext Page

TABLE OF CONTENTS - APPENDIX 1

C1 GUIDELINES FOR TRANSFER OPERATIONS

C1.1 PLANNING TRANSFER OPERATIONS
C1.2 MONITORING TRANSFER OPERATIONS

C1 GUIDELINES FOR TRANSFER OPERATIONS 

A stowage plan must be produced showing cargo distribution on the tankship and covering the following:

  Information on each product (see Part III)
  Quantity of each product
  Line(s) to be used
  Operating pressure and maximum allowable pressure
  Temperature limits
  The initial, maximum and top off flow rates, having regard to:

  • the nature of the cargo
  • the arrangements and capacity of the ship's cargo lines, shore pipelines and tanks
  • the maximum allowable pressure and flow rate in the deliverer/receiver hoses or arms
  • limitations because of electrostatic properties, use of automatic shut-down valves or any other limitations which may affect flow rates

There must be an agreement on the timing and sequence in which the ship's tank(s) are to be filled or discharged, taking account of:

  Deliverer/Receiver tank change over
  Avoidance of contamination of cargo
  Pipeline clearing for discharge
  Crude oil washing, if employed, or other tank cleaning method
  Trim and freeboard of the tankship
  Hull stresses which will not be exceeded
  Ballasting/Deballasting operations

Also, taking account of the following:

  Inspection of ship's cargo tanks before loading or discharging
  Venting requirements  
  Bunkering or storing operations

Working Hours Schedule

Period of time Deliverer Deck Watch Officer Deliverer Bridge Watch Officer Receiver Deck Watch Officer Receiver Bridge Watch Officer Deliverer Master Signature Receiver Master Signature
             
             
             
             
             
             
             
             
             
             
             

C1.1 PLANNING TRANSFER OPERATIONS 

Loading / Discharging (TSCL item 8)

No Product Tank No Quantity Line No Max. Pressure Temp. oC Rate Est. Time Compl. Time
1                  
2                  
3                  
4                  
5                  
6                  
7                  
8                  
9                  
10                  
11                  
12                  

Deballasting / Ballasting Cargo Tanks (TSCL item 8) 

Tank No Quantity Line No Max. Pressure Salt / Fresh Last Cargo Est.Time Compl. Time
               
               
               
               

Tank Washing (TSCL item 37) 

Group Tanks No Method Duration Cold / Hot Slop Tk / Shore Est . Slop Quant. Compl. time
             
             
             
             

C1.2 MONITORING TRANSFER OPERATIONS 

Product Tank No Ullage (Time scale)
                                                               
                                 
                           
                           
                           
                           
                           
                           
                           
                           
                           
                           
                           
                           
                           

1. Mooring *

                       

2. Towing wires

                       

3. Safe access

                       

4. Ready to move

                       

5. Effective watch

                       

6. Communications

                       

12. Hoses / arms

                       

13. Scuppers / drip trays

                       

17. Tank venting

                       

23. Doors & Ports

                       

27. Smoking requirements

                       

28. Naked light req.

                       

30. Required personnel

                       

33. Closed loading

                       

INITIALS :

                       

* Item numbers refer to the Tanker Safety Checklist B1.
These items have to be checked periodically during transfer operations.