C1 GUIDELINES FOR TRANSFER OPERATIONS
C1.1 PLANNING TRANSFER OPERATIONS
C1.2 MONITORING TRANSFER OPERATIONS
C1 GUIDELINES FOR TRANSFER OPERATIONS
A stowage plan must be produced showing cargo distribution on the tankship and covering the following:
Information on each product (see Part III)
Quantity of each product
Line(s) to be used
Operating pressure and maximum allowable pressure
Temperature limits
The initial, maximum and top off flow rates, having regard to:
There must be an agreement on the timing and sequence in which the ship's tank(s) are to be filled or discharged, taking account of:
Deliverer/Receiver tank change over
Avoidance of contamination of cargo
Pipeline clearing for discharge
Crude oil washing, if employed, or other tank cleaning method
Trim and freeboard of the tankship
Hull stresses which will not be exceeded
Ballasting/Deballasting operations
Also, taking account of the following:
| Period of time | Deliverer Deck Watch Officer | Deliverer Bridge Watch Officer | Receiver Deck Watch Officer | Receiver Bridge Watch Officer | Deliverer Master Signature | Receiver Master Signature |
|---|---|---|---|---|---|---|
C1.1 PLANNING TRANSFER OPERATIONS
Loading / Discharging (TSCL item 8)
| No | Product | Tank No | Quantity | Line No | Max. Pressure | Temp. oC | Rate | Est. Time | Compl. Time |
|---|---|---|---|---|---|---|---|---|---|
| 1 | |||||||||
| 2 | |||||||||
| 3 | |||||||||
| 4 | |||||||||
| 5 | |||||||||
| 6 | |||||||||
| 7 | |||||||||
| 8 | |||||||||
| 9 | |||||||||
| 10 | |||||||||
| 11 | |||||||||
| 12 |
Deballasting / Ballasting Cargo Tanks (TSCL item 8)
| Tank No | Quantity | Line No | Max. Pressure | Salt / Fresh | Last Cargo | Est.Time | Compl. Time |
|---|---|---|---|---|---|---|---|
| Group Tanks No | Method | Duration | Cold / Hot | Slop Tk / Shore | Est . Slop Quant. | Compl. time |
|---|---|---|---|---|---|---|
C1.2 MONITORING TRANSFER OPERATIONS
| Product | Tank No | Ullage (Time scale) | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
1. Mooring * |
|||||||||||||
|
2. Towing wires |
|||||||||||||
|
3. Safe access |
|||||||||||||
|
4. Ready to move |
|||||||||||||
|
5. Effective watch |
|||||||||||||
|
6. Communications |
|||||||||||||
|
12. Hoses / arms |
|||||||||||||
|
13. Scuppers / drip trays |
|||||||||||||
|
17. Tank venting |
|||||||||||||
|
23. Doors & Ports |
|||||||||||||
|
27. Smoking requirements |
|||||||||||||
|
28. Naked light req. |
|||||||||||||
|
30. Required personnel |
|||||||||||||
|
33. Closed loading |
|||||||||||||
|
INITIALS : |
|||||||||||||
* Item numbers refer to the Tanker Safety Checklist B1.
These items have to be checked periodically during transfer operations.