Government of Canada navigation bar

Symbol of the Government of Canada

Primary site navigation bar

Breadcrumb

  1. Home
  2. Rail Transportation
  3. Rail Safety
  4. Legislation
  5. Rules
  6. Canadian Rail Operating Rules
  7. Top Cancellation (Protection of Track Units and Track Work)

Top Cancellation (Protection of Track Units and Track Work)

864. Foreman Requirements

Before a TOP is cancelled the foreman must;

  1.  
    1. ensure that any employees or track unit(s) for which the foreman is responsible are clear of the track; and
    2. ensure that the track within the limits of the TOP is safe for movements at normal speed, or is protected as prescribed by Rule 843; or
  2. ensure all track units or track work for which the foreman is responsible within the limits of the TOP are protected as prescribed by Rule 842; or
  3. be issued a new TOP to include the track affected by the track work or occupied by the track unit(s); and
  4. promptly advise the RTC, stating the foreman's name, TOP number and the limits of the TOP to be cancelled.

865. RTC Requirements

When a TOP is no longer required;

  1. the limits of the TOP to be cancelled must be verified by the foreman and the RTC;
  2. the RTC will cancel the TOP by stating to the foreman the TOP number, the cancellation time and the initials of the RTC;
  3. the foreman must acknowledge the cancellation by repeating the TOP number, the cancelled time and the initials of the RTC to the RTC; and
  4. the cancellation takes effect once it has been correctly repeated and acknowledged by the foreman.


Previous Section: Follow-up Top

Date modified:
2009-07-17